Abstract—This paper studies the challenging problem of scheduling single-arm multi-cluster tools with wafer residency time constraints. They have a linear topology and their bottleneck tool is process-bound. This work aims to find an optimal one-wafer cyclic schedule. With the Petri net model developed in our previous work and the minimal cycle time for a multicluster tool without wafer resi…