Elibrary Perpustakaan Universitas Riau

Ebook, artikel jurnal dan artikel ilmiah

  • Beranda
  • Informasi
  • Berita
  • Bantuan
  • Pustakawan
  • Area Anggota
  • Pilih Bahasa :
    Bahasa Arab Bahasa Bengal Bahasa Brazil Portugis Bahasa Inggris Bahasa Spanyol Bahasa Jerman Bahasa Indonesia Bahasa Jepang Bahasa Melayu Bahasa Persia Bahasa Rusia Bahasa Thailand Bahasa Turki Bahasa Urdu

Pencarian berdasarkan :

SEMUA Pengarang Subjek ISBN/ISSN Pencarian Spesifik

Pencarian terakhir:

{{tmpObj[k].text}}
No image available for this title
Penanda Bagikan

e-journal

Customer Order Scheduling on Unrelated Parallel Machines to Minimize Total Completion Time

Xiaoyun Xu [et.al.] - Nama Orang;

This paper considers a customer order scheduling problem with product type splitting property in the unrelated parallel machine environment. Product type splitting property refers to the case where each customer order consists of several product types and the workload of all associated product types can be
arbitrarily split among machines. The objective is to minimize the total completion time of the orders. Several optimality properties of the general problem are derived. Based on these properties, an easily computable lower bound of the objective function is established. Two important special cases are further explored. Three heuristics are proposed to solve the general problem. It is shown that the worst case performances of all the three heuristics are bounded by simple functions of makespan related measures.
Numerical studies are carried out to demonstrate the effectiveness of the lower bound and heuristics. Additional insights are offered by comparison studies focusing on the computational efficiency of
the heuristics proposed.
Note to Practitioners—Customer order scheduling model has wide applications in industries where the entire order requires one shipment delivery. In many applications such as pigments dyes manufacturing, auto repair, grocery and so on, consideration of orders rather than individual jobs is often preferred. Moreover, the general machine environment considered in this study ensures that the methods proposed can be applied in most of the parallel machine situations that are customer order-oriented. Type splitting property is also a relatively recent field of inquiry and a natural property of manufacturing with continuous output.
Index Terms—Order scheduling, splitting, unrelated parallel machine, total completion time.


Ketersediaan

Tidak ada salinan data

Informasi Detail
Judul Seri
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING
No. Panggil
-
Penerbit
New York : IEEE., 2015
Deskripsi Fisik
IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, VOL. 12, NO. 1, JANUARY 2015
Bahasa
English
ISBN/ISSN
1545-5955
Klasifikasi
-
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
-
Edisi
VOL. 12, NO. 1, JANUARY 2015
Subjek
TEKNIK
Info Detail Spesifik
-
Pernyataan Tanggungjawab
Yuli/Agus
Versi lain/terkait

Tidak tersedia versi lain

Lampiran Berkas
  • FULL TEXT. Customer Order Scheduling on Unrelated Parallel Machines to Minimize Total Completion Time
Komentar

Anda harus masuk sebelum memberikan komentar

Elibrary Perpustakaan Universitas Riau
  • Informasi
  • Layanan
  • Pustakawan
  • Area Anggota

Tentang Kami

As a complete Library Management System, SLiMS (Senayan Library Management System) has many features that will help libraries and librarians to do their job easily and quickly. Follow this link to show some features provided by SLiMS.

Cari

masukkan satu atau lebih kata kunci dari judul, pengarang, atau subjek

Donasi untuk SLiMS Kontribusi untuk SLiMS?

© 2025 — Senayan Developer Community

Ditenagai oleh SLiMS
Pilih subjek yang menarik bagi Anda
  • Karya Umum
  • Filsafat
  • Agama
  • Ilmu-ilmu Sosial
  • Bahasa
  • Ilmu-ilmu Murni
  • Ilmu-ilmu Terapan
  • Kesenian, Hiburan, dan Olahraga
  • Kesusastraan
  • Geografi dan Sejarah
Icons made by Freepik from www.flaticon.com
Pencarian Spesifik
Kemana ingin Anda bagikan?