This paper presents a case study on realizing a 3D model of surfaces that will be leveled in order to build a shopping center. In the first phase, devices and methodology adequately used are presented, being adapted specifically to the existing situation on the ground and to the required accuracy for lifting. Results desired in this case study are primarily focused on tracking effectiveness,…