The original purpose of this book, in 1965, was to present and discuss the critical path method (CPM) and its use in the construction industry. At that time, CPM was a young but proven technique—usually considered to be optional. When the second edition was published in 1971, the network approach to scheduling was becoming a regular requirement in construction contracts. The third editio…