Apart from number and size of machines in a farm, operations scheduling can also affect timeliness costs. In this study a new equation was presented for determination of timeliness costs and it was proven that the new equation is a generalization of the well-known ASABE standard equation. Based on the new equation, a parameter namely,timeliness index was defined that indicates the distribution …