Steel catenary risers are widely used in the development of marine oil and gas. Deepwater installation is an important procedure that will affect the service life of steel catenary risers. A comprehensive study of a mechanical model for the deepwater steel catenary riser transfer process during installation is performed in this paper. This model is derived on the basis of large deformation beam…